Translate Documents - Hydro Power Plant

Project : Translate Documents - Hydro Power Plant Customer : Andritz Hydro GmbH - Representative at Hanoi Location : Hanoi, Vietnam Time : From May and August, 2011 Beer Factory Control System

Project : Beer Factory Control System Customer : Hanoi - Kim Bai Beer Factory Location : Kim Bai, Hanoi Time : From February to April, 2011 My Work in 2010
- Previous
- Next
- Stop
- Play
Beer Factory Control System

Project : Beer Factory Control System Customer : Hanoi - Kim Bai Beer Factory Location : Kim Bai, Hanoi Time : From October to December, 2010 Maintainance - Duong Malt Factory
Project : Maintainance - Duong Malt Factory Customer : Duong Malt Factory Location : Tien Son IZ, Bac Ninh, Vietnam Time : From August to December, 2010 Terminal Board for Schneider PLC

Project : Terminal Board for Schneider PLC Customer : Individual Customer Location : Hanoi, Vietnam Time : November , 2010 Stone Cutting Control Board Ver 2
Project : Stone Cutting Control Board Customer : Truong Xuan Company Location : Bac Giang, Vietnam Time : From July to September, 2010 Assembly Textile Machine Line
Project : Assembly Textile Machine Line Customer : Co Bi Garment Factory Location : Gia Lam, Hanoi, Vietnam Time : From June, 2010 Translate Documents - Hydro Power Plant

Project : Translate Documents - Hydro Power Plant Customer : Andritz Hydro GmbH - Representative at Hanoi Location : Hanoi, Vietnam Time : From April to December, 2010 Electrostatic Precipitator System

Project : Electrostatic Precipitator System Customer : VINAPACO Location : Bai Bang, Phu Tho, Vietnam Time : From May to July, 2010 Winder Machine Upgrade

Project : Winder Machine Upgrade Customer : Bai Bang Paper Company Location : Bai Bang, Phu Tho, Vietnam Time : From January to May, 2010 My Work in 2009
- Previous
- Next
- Stop
- Play
Translate Documents - Hydro Power Plant

Project : Translate Documents - Hydro Power Plant Customer : Andritz Hydro GmbH - Representative at Hanoi Location : Hanoi, Vietnam Time : From March to November, 2010 Stone Cutting Control Board Ver 1

Project : Stone Cutting Control Board Ver 1 Customer : Truong Xuan Company Location : Bac Giang, Vietnam Time : From July to September, 2010 PCB Design (VGA interface, Coupling Board)

Project : PCB Design (VGA interface, Coupling Board) Customer : BAPACO and Individual Customer Location : Bac Ninh and Phu Tho, Vietnam Time : December, 2010 Yen So Pumping Station Scada System

Project : Yen So Pumping Station Scada System Customer : Hanoi Sewerage and Drainwage Co.,Ltd Location : Yen So, Thanh Tri, Hanoi, Vietnam Time : From January to March, 2009 Automatic Voltage Regulator for Genrator

Project : Automatic Voltage Regulator for Geneator Customer : Thanh Nam Beer Factory Location : Le Mon IZ, Thanh Hoa, Vietnam Time : From March to May, 2009 Scada HMI Troubleshoot for Hai Ha JSC

Project : Scada HMI Troubleshoot Customer : Hai Ha Confectionery JSC Location : Viet Tri, Phu Tho, Vietnam Time : April, 2009 Training Course - Operation for DCS Centum CS3000

Project : Training Course - Operation for DCS Centum CS3000 Customer : Bai Bang Paper Company Location : Bai Bang, Phu Tho, Vietnam Time : January, 2009 Training - Operation,Engineering, Maintainace CS3000

Project : Training - Operation, Engineering, Maintainace CS3000 Customer : Lam Thao Chemical Factory Location : Lam Thao, Phu Tho, Vietnam Time : From May to June, 2009 Balance Control System for LASH Ship

Project : Balance Control System for LASH Ship Customer : VINASHIN Location : Hanoi - Sai Gon, Vietnam Time : From July,2009 to March, 2010 Profibus Network Troubleshoot for Duong Malt JSC
Project : Profibus Network Troubleshoot for Duong Malt JSC Customer : Duong Malt JSC Location : Tien Son IZ, Bac Ninh, Vietnam Time : December, 2009 Troubleshoot for Fiber Optical Devision

Project : Troubleshoot for Fiber Optical Devision Customer : Thang Long Cable JSC Location : Pho Noi A IZ, Hung Yen, Vietnam Time : December, 2009 My Work in 2008
- Previous
- Next
- Stop
- Play
Yen So Pumping Station Scada System

Project : Yen So Pumping Station Scada System Customer : Hanoi Sewerage and Drainwage Co.,Ltd Location : Yen So, Thanh Tri, Hanoi, Vietnam Time : From May to November, 2008 Translate Documents - DCS Supcon

Project : Translate Documents - DCS Supcon Customer : ZHEJIANG SUPCON Technology Co.,Ltd Location : Hanoi, Vietnam Time : August, 2008 Phu Gia Feed Mill Control System

Project : Phu Gia Feed Mill Control System Customer : Phu Gia Feed Mill (NASACO) Location : Kinh Mon IZ, Thanh Hoa, Vietnam Time : From May to November, 2008 Design Active Filter Experiment Panel

Project : Design Active Filter Experiment Panel Customer : Thai Nguyen University Location : Hitech Center, Hanoi, Vietnam Time : From March to May, 2008 Translate Documents - Operator Manual Gas Analysers

Project : Translate Documents - Operator Manual Gas Analysers Customer : Hoang Mai Cement Factory Location : Hanoi, Vietnam Time : January,2008 Training Course - Engineering for DCS Centum CS3000

Project : Training Course - Engineering for DCS Centum CS3000 Customer : Bai Bang Paper Company Location : Bai Bang, Phu Tho, Vietnam Time : February, 2008 My Work in 2007
- Previous
- Next
- Stop
- Play
Translate Technical Documents

Project : Translate Technical Documents Customer : Uong Bi Thermal Power Plant Location : Hanoi Time : October,2007 Training Course - Process Control

Project : Training Course - Process Control Customer : Asian Institute of Technology Center in VN Location : Hanoi, Vietnam Time : November, 2007 Coal Distribution System

Project : Coal Distribution System Customer : Ninh Binh Thermal Power Plant Location : Ninh Binh, Vietnam Time : From December, 2007 to February,2008 Checking Garment Factory

Project : Checking Garment Factory Customer : Hapro Group Location : Ninh Hiep IZ, Bac Ninh, Vietnam Time : From January, 2008 to February,2008 Training Course - ACS600

Project : Training Course - ACS600 Customer : Bai Bang Paper Company Location : Phu Ninh, Phu Tho Time : October, 2007 Chemical Scada System

Project : Chemical Scada System Customer : Chemical Factory - VINAPACO Location : Bai Bang, Phu Tho, Vietnam Time : From September to December, 2007 -
My Works in 2008
( 6 Danh mục )
My Work in 2011
- Previous
- Next
- Stop
- Play
Translate Documents - Hydro Power Plant

Project : Translate Documents - Hydro Power Plant Customer : Andritz Hydro GmbH - Representative at Hanoi Location : Hanoi, Vietnam Time : From May and August, 2011 Beer Factory Control System

Project : Beer Factory Control System Customer : Hanoi - Kim Bai Beer Factory Location : Kim Bai, Hanoi Time : From February to April, 2011 My Work in 2010
- Previous
- Next
- Stop
- Play
Beer Factory Control System

Project : Beer Factory Control System Customer : Hanoi - Kim Bai Beer Factory Location : Kim Bai, Hanoi Time : From October to December, 2010 Maintainance - Duong Malt Factory
Project : Maintainance - Duong Malt Factory Customer : Duong Malt Factory Location : Tien Son IZ, Bac Ninh, Vietnam Time : From August to December, 2010 Terminal Board for Schneider PLC

Project : Terminal Board for Schneider PLC Customer : Individual Customer Location : Hanoi, Vietnam Time : November , 2010 Stone Cutting Control Board Ver 2
Project : Stone Cutting Control Board Customer : Truong Xuan Company Location : Bac Giang, Vietnam Time : From July to September, 2010 Assembly Textile Machine Line
Project : Assembly Textile Machine Line Customer : Co Bi Garment Factory Location : Gia Lam, Hanoi, Vietnam Time : From June, 2010 Translate Documents - Hydro Power Plant

Project : Translate Documents - Hydro Power Plant Customer : Andritz Hydro GmbH - Representative at Hanoi Location : Hanoi, Vietnam Time : From April to December, 2010 Electrostatic Precipitator System

Project : Electrostatic Precipitator System Customer : VINAPACO Location : Bai Bang, Phu Tho, Vietnam Time : From May to July, 2010 Winder Machine Upgrade

Project : Winder Machine Upgrade Customer : Bai Bang Paper Company Location : Bai Bang, Phu Tho, Vietnam Time : From January to May, 2010 My Work in 2009
- Previous
- Next
- Stop
- Play
Translate Documents - Hydro Power Plant

Project : Translate Documents - Hydro Power Plant Customer : Andritz Hydro GmbH - Representative at Hanoi Location : Hanoi, Vietnam Time : From March to November, 2010 Stone Cutting Control Board Ver 1

Project : Stone Cutting Control Board Ver 1 Customer : Truong Xuan Company Location : Bac Giang, Vietnam Time : From July to September, 2010 PCB Design (VGA interface, Coupling Board)

Project : PCB Design (VGA interface, Coupling Board) Customer : BAPACO and Individual Customer Location : Bac Ninh and Phu Tho, Vietnam Time : December, 2010 Yen So Pumping Station Scada System

Project : Yen So Pumping Station Scada System Customer : Hanoi Sewerage and Drainwage Co.,Ltd Location : Yen So, Thanh Tri, Hanoi, Vietnam Time : From January to March, 2009 Automatic Voltage Regulator for Genrator

Project : Automatic Voltage Regulator for Geneator Customer : Thanh Nam Beer Factory Location : Le Mon IZ, Thanh Hoa, Vietnam Time : From March to May, 2009 Scada HMI Troubleshoot for Hai Ha JSC

Project : Scada HMI Troubleshoot Customer : Hai Ha Confectionery JSC Location : Viet Tri, Phu Tho, Vietnam Time : April, 2009 Training Course - Operation for DCS Centum CS3000

Project : Training Course - Operation for DCS Centum CS3000 Customer : Bai Bang Paper Company Location : Bai Bang, Phu Tho, Vietnam Time : January, 2009 Training - Operation,Engineering, Maintainace CS3000

Project : Training - Operation, Engineering, Maintainace CS3000 Customer : Lam Thao Chemical Factory Location : Lam Thao, Phu Tho, Vietnam Time : From May to June, 2009 Balance Control System for LASH Ship

Project : Balance Control System for LASH Ship Customer : VINASHIN Location : Hanoi - Sai Gon, Vietnam Time : From July,2009 to March, 2010 Profibus Network Troubleshoot for Duong Malt JSC
Project : Profibus Network Troubleshoot for Duong Malt JSC Customer : Duong Malt JSC Location : Tien Son IZ, Bac Ninh, Vietnam Time : December, 2009 Troubleshoot for Fiber Optical Devision

Project : Troubleshoot for Fiber Optical Devision Customer : Thang Long Cable JSC Location : Pho Noi A IZ, Hung Yen, Vietnam Time : December, 2009 My Work in 2008
- Previous
- Next
- Stop
- Play
Yen So Pumping Station Scada System

Project : Yen So Pumping Station Scada System Customer : Hanoi Sewerage and Drainwage Co.,Ltd Location : Yen So, Thanh Tri, Hanoi, Vietnam Time : From May to November, 2008 Translate Documents - DCS Supcon

Project : Translate Documents - DCS Supcon Customer : ZHEJIANG SUPCON Technology Co.,Ltd Location : Hanoi, Vietnam Time : August, 2008 Phu Gia Feed Mill Control System

Project : Phu Gia Feed Mill Control System Customer : Phu Gia Feed Mill (NASACO) Location : Kinh Mon IZ, Thanh Hoa, Vietnam Time : From May to November, 2008 Design Active Filter Experiment Panel

Project : Design Active Filter Experiment Panel Customer : Thai Nguyen University Location : Hitech Center, Hanoi, Vietnam Time : From March to May, 2008 Translate Documents - Operator Manual Gas Analysers

Project : Translate Documents - Operator Manual Gas Analysers Customer : Hoang Mai Cement Factory Location : Hanoi, Vietnam Time : January,2008 Training Course - Engineering for DCS Centum CS3000

Project : Training Course - Engineering for DCS Centum CS3000 Customer : Bai Bang Paper Company Location : Bai Bang, Phu Tho, Vietnam Time : February, 2008 My Work in 2007
- Previous
- Next
- Stop
- Play
Translate Technical Documents

Project : Translate Technical Documents Customer : Uong Bi Thermal Power Plant Location : Hanoi Time : October,2007 Training Course - Process Control

Project : Training Course - Process Control Customer : Asian Institute of Technology Center in VN Location : Hanoi, Vietnam Time : November, 2007 Coal Distribution System

Project : Coal Distribution System Customer : Ninh Binh Thermal Power Plant Location : Ninh Binh, Vietnam Time : From December, 2007 to February,2008 Checking Garment Factory

Project : Checking Garment Factory Customer : Hapro Group Location : Ninh Hiep IZ, Bac Ninh, Vietnam Time : From January, 2008 to February,2008 Training Course - ACS600

Project : Training Course - ACS600 Customer : Bai Bang Paper Company Location : Phu Ninh, Phu Tho Time : October, 2007 Chemical Scada System

Project : Chemical Scada System Customer : Chemical Factory - VINAPACO Location : Bai Bang, Phu Tho, Vietnam Time : From September to December, 2007 -
My Works in 2009
( 11 Danh mục )
My Work in 2011
- Previous
- Next
- Stop
- Play
Translate Documents - Hydro Power Plant

Project : Translate Documents - Hydro Power Plant Customer : Andritz Hydro GmbH - Representative at Hanoi Location : Hanoi, Vietnam Time : From May and August, 2011 Beer Factory Control System

Project : Beer Factory Control System Customer : Hanoi - Kim Bai Beer Factory Location : Kim Bai, Hanoi Time : From February to April, 2011 My Work in 2010
- Previous
- Next
- Stop
- Play
Beer Factory Control System

Project : Beer Factory Control System Customer : Hanoi - Kim Bai Beer Factory Location : Kim Bai, Hanoi Time : From October to December, 2010 Maintainance - Duong Malt Factory
Project : Maintainance - Duong Malt Factory Customer : Duong Malt Factory Location : Tien Son IZ, Bac Ninh, Vietnam Time : From August to December, 2010 Terminal Board for Schneider PLC

Project : Terminal Board for Schneider PLC Customer : Individual Customer Location : Hanoi, Vietnam Time : November , 2010 Stone Cutting Control Board Ver 2
Project : Stone Cutting Control Board Customer : Truong Xuan Company Location : Bac Giang, Vietnam Time : From July to September, 2010 Assembly Textile Machine Line
Project : Assembly Textile Machine Line Customer : Co Bi Garment Factory Location : Gia Lam, Hanoi, Vietnam Time : From June, 2010 Translate Documents - Hydro Power Plant

Project : Translate Documents - Hydro Power Plant Customer : Andritz Hydro GmbH - Representative at Hanoi Location : Hanoi, Vietnam Time : From April to December, 2010 Electrostatic Precipitator System

Project : Electrostatic Precipitator System Customer : VINAPACO Location : Bai Bang, Phu Tho, Vietnam Time : From May to July, 2010 Winder Machine Upgrade

Project : Winder Machine Upgrade Customer : Bai Bang Paper Company Location : Bai Bang, Phu Tho, Vietnam Time : From January to May, 2010 My Work in 2009
- Previous
- Next
- Stop
- Play
Translate Documents - Hydro Power Plant

Project : Translate Documents - Hydro Power Plant Customer : Andritz Hydro GmbH - Representative at Hanoi Location : Hanoi, Vietnam Time : From March to November, 2010 Stone Cutting Control Board Ver 1

Project : Stone Cutting Control Board Ver 1 Customer : Truong Xuan Company Location : Bac Giang, Vietnam Time : From July to September, 2010 PCB Design (VGA interface, Coupling Board)

Project : PCB Design (VGA interface, Coupling Board) Customer : BAPACO and Individual Customer Location : Bac Ninh and Phu Tho, Vietnam Time : December, 2010 Yen So Pumping Station Scada System

Project : Yen So Pumping Station Scada System Customer : Hanoi Sewerage and Drainwage Co.,Ltd Location : Yen So, Thanh Tri, Hanoi, Vietnam Time : From January to March, 2009 Automatic Voltage Regulator for Genrator

Project : Automatic Voltage Regulator for Geneator Customer : Thanh Nam Beer Factory Location : Le Mon IZ, Thanh Hoa, Vietnam Time : From March to May, 2009 Scada HMI Troubleshoot for Hai Ha JSC

Project : Scada HMI Troubleshoot Customer : Hai Ha Confectionery JSC Location : Viet Tri, Phu Tho, Vietnam Time : April, 2009 Training Course - Operation for DCS Centum CS3000

Project : Training Course - Operation for DCS Centum CS3000 Customer : Bai Bang Paper Company Location : Bai Bang, Phu Tho, Vietnam Time : January, 2009 Training - Operation,Engineering, Maintainace CS3000

Project : Training - Operation, Engineering, Maintainace CS3000 Customer : Lam Thao Chemical Factory Location : Lam Thao, Phu Tho, Vietnam Time : From May to June, 2009 Balance Control System for LASH Ship

Project : Balance Control System for LASH Ship Customer : VINASHIN Location : Hanoi - Sai Gon, Vietnam Time : From July,2009 to March, 2010 Profibus Network Troubleshoot for Duong Malt JSC
Project : Profibus Network Troubleshoot for Duong Malt JSC Customer : Duong Malt JSC Location : Tien Son IZ, Bac Ninh, Vietnam Time : December, 2009 Troubleshoot for Fiber Optical Devision

Project : Troubleshoot for Fiber Optical Devision Customer : Thang Long Cable JSC Location : Pho Noi A IZ, Hung Yen, Vietnam Time : December, 2009 My Work in 2008
- Previous
- Next
- Stop
- Play
Yen So Pumping Station Scada System

Project : Yen So Pumping Station Scada System Customer : Hanoi Sewerage and Drainwage Co.,Ltd Location : Yen So, Thanh Tri, Hanoi, Vietnam Time : From May to November, 2008 Translate Documents - DCS Supcon

Project : Translate Documents - DCS Supcon Customer : ZHEJIANG SUPCON Technology Co.,Ltd Location : Hanoi, Vietnam Time : August, 2008 Phu Gia Feed Mill Control System

Project : Phu Gia Feed Mill Control System Customer : Phu Gia Feed Mill (NASACO) Location : Kinh Mon IZ, Thanh Hoa, Vietnam Time : From May to November, 2008 Design Active Filter Experiment Panel

Project : Design Active Filter Experiment Panel Customer : Thai Nguyen University Location : Hitech Center, Hanoi, Vietnam Time : From March to May, 2008 Translate Documents - Operator Manual Gas Analysers

Project : Translate Documents - Operator Manual Gas Analysers Customer : Hoang Mai Cement Factory Location : Hanoi, Vietnam Time : January,2008 Training Course - Engineering for DCS Centum CS3000

Project : Training Course - Engineering for DCS Centum CS3000 Customer : Bai Bang Paper Company Location : Bai Bang, Phu Tho, Vietnam Time : February, 2008 My Work in 2007
- Previous
- Next
- Stop
- Play
Translate Technical Documents

Project : Translate Technical Documents Customer : Uong Bi Thermal Power Plant Location : Hanoi Time : October,2007 Training Course - Process Control

Project : Training Course - Process Control Customer : Asian Institute of Technology Center in VN Location : Hanoi, Vietnam Time : November, 2007 Coal Distribution System

Project : Coal Distribution System Customer : Ninh Binh Thermal Power Plant Location : Ninh Binh, Vietnam Time : From December, 2007 to February,2008 Checking Garment Factory

Project : Checking Garment Factory Customer : Hapro Group Location : Ninh Hiep IZ, Bac Ninh, Vietnam Time : From January, 2008 to February,2008 Training Course - ACS600

Project : Training Course - ACS600 Customer : Bai Bang Paper Company Location : Phu Ninh, Phu Tho Time : October, 2007 Chemical Scada System

Project : Chemical Scada System Customer : Chemical Factory - VINAPACO Location : Bai Bang, Phu Tho, Vietnam Time : From September to December, 2007 -
My Works in 2010
( 8 Danh mục )
My Work in 2011
- Previous
- Next
- Stop
- Play
Translate Documents - Hydro Power Plant

Project : Translate Documents - Hydro Power Plant Customer : Andritz Hydro GmbH - Representative at Hanoi Location : Hanoi, Vietnam Time : From May and August, 2011 Beer Factory Control System

Project : Beer Factory Control System Customer : Hanoi - Kim Bai Beer Factory Location : Kim Bai, Hanoi Time : From February to April, 2011 My Work in 2010
- Previous
- Next
- Stop
- Play
Beer Factory Control System

Project : Beer Factory Control System Customer : Hanoi - Kim Bai Beer Factory Location : Kim Bai, Hanoi Time : From October to December, 2010 Maintainance - Duong Malt Factory
Project : Maintainance - Duong Malt Factory Customer : Duong Malt Factory Location : Tien Son IZ, Bac Ninh, Vietnam Time : From August to December, 2010 Terminal Board for Schneider PLC

Project : Terminal Board for Schneider PLC Customer : Individual Customer Location : Hanoi, Vietnam Time : November , 2010 Stone Cutting Control Board Ver 2
Project : Stone Cutting Control Board Customer : Truong Xuan Company Location : Bac Giang, Vietnam Time : From July to September, 2010 Assembly Textile Machine Line
Project : Assembly Textile Machine Line Customer : Co Bi Garment Factory Location : Gia Lam, Hanoi, Vietnam Time : From June, 2010 Translate Documents - Hydro Power Plant

Project : Translate Documents - Hydro Power Plant Customer : Andritz Hydro GmbH - Representative at Hanoi Location : Hanoi, Vietnam Time : From April to December, 2010 Electrostatic Precipitator System

Project : Electrostatic Precipitator System Customer : VINAPACO Location : Bai Bang, Phu Tho, Vietnam Time : From May to July, 2010 Winder Machine Upgrade

Project : Winder Machine Upgrade Customer : Bai Bang Paper Company Location : Bai Bang, Phu Tho, Vietnam Time : From January to May, 2010 My Work in 2009
- Previous
- Next
- Stop
- Play
Translate Documents - Hydro Power Plant

Project : Translate Documents - Hydro Power Plant Customer : Andritz Hydro GmbH - Representative at Hanoi Location : Hanoi, Vietnam Time : From March to November, 2010 Stone Cutting Control Board Ver 1

Project : Stone Cutting Control Board Ver 1 Customer : Truong Xuan Company Location : Bac Giang, Vietnam Time : From July to September, 2010 PCB Design (VGA interface, Coupling Board)

Project : PCB Design (VGA interface, Coupling Board) Customer : BAPACO and Individual Customer Location : Bac Ninh and Phu Tho, Vietnam Time : December, 2010 Yen So Pumping Station Scada System

Project : Yen So Pumping Station Scada System Customer : Hanoi Sewerage and Drainwage Co.,Ltd Location : Yen So, Thanh Tri, Hanoi, Vietnam Time : From January to March, 2009 Automatic Voltage Regulator for Genrator

Project : Automatic Voltage Regulator for Geneator Customer : Thanh Nam Beer Factory Location : Le Mon IZ, Thanh Hoa, Vietnam Time : From March to May, 2009 Scada HMI Troubleshoot for Hai Ha JSC

Project : Scada HMI Troubleshoot Customer : Hai Ha Confectionery JSC Location : Viet Tri, Phu Tho, Vietnam Time : April, 2009 Training Course - Operation for DCS Centum CS3000

Project : Training Course - Operation for DCS Centum CS3000 Customer : Bai Bang Paper Company Location : Bai Bang, Phu Tho, Vietnam Time : January, 2009 Training - Operation,Engineering, Maintainace CS3000

Project : Training - Operation, Engineering, Maintainace CS3000 Customer : Lam Thao Chemical Factory Location : Lam Thao, Phu Tho, Vietnam Time : From May to June, 2009 Balance Control System for LASH Ship

Project : Balance Control System for LASH Ship Customer : VINASHIN Location : Hanoi - Sai Gon, Vietnam Time : From July,2009 to March, 2010 Profibus Network Troubleshoot for Duong Malt JSC
Project : Profibus Network Troubleshoot for Duong Malt JSC Customer : Duong Malt JSC Location : Tien Son IZ, Bac Ninh, Vietnam Time : December, 2009 Troubleshoot for Fiber Optical Devision

Project : Troubleshoot for Fiber Optical Devision Customer : Thang Long Cable JSC Location : Pho Noi A IZ, Hung Yen, Vietnam Time : December, 2009 My Work in 2008
- Previous
- Next
- Stop
- Play
Yen So Pumping Station Scada System

Project : Yen So Pumping Station Scada System Customer : Hanoi Sewerage and Drainwage Co.,Ltd Location : Yen So, Thanh Tri, Hanoi, Vietnam Time : From May to November, 2008 Translate Documents - DCS Supcon

Project : Translate Documents - DCS Supcon Customer : ZHEJIANG SUPCON Technology Co.,Ltd Location : Hanoi, Vietnam Time : August, 2008 Phu Gia Feed Mill Control System

Project : Phu Gia Feed Mill Control System Customer : Phu Gia Feed Mill (NASACO) Location : Kinh Mon IZ, Thanh Hoa, Vietnam Time : From May to November, 2008 Design Active Filter Experiment Panel

Project : Design Active Filter Experiment Panel Customer : Thai Nguyen University Location : Hitech Center, Hanoi, Vietnam Time : From March to May, 2008 Translate Documents - Operator Manual Gas Analysers

Project : Translate Documents - Operator Manual Gas Analysers Customer : Hoang Mai Cement Factory Location : Hanoi, Vietnam Time : January,2008 Training Course - Engineering for DCS Centum CS3000

Project : Training Course - Engineering for DCS Centum CS3000 Customer : Bai Bang Paper Company Location : Bai Bang, Phu Tho, Vietnam Time : February, 2008 My Work in 2007
- Previous
- Next
- Stop
- Play
Translate Technical Documents

Project : Translate Technical Documents Customer : Uong Bi Thermal Power Plant Location : Hanoi Time : October,2007 Training Course - Process Control

Project : Training Course - Process Control Customer : Asian Institute of Technology Center in VN Location : Hanoi, Vietnam Time : November, 2007 Coal Distribution System

Project : Coal Distribution System Customer : Ninh Binh Thermal Power Plant Location : Ninh Binh, Vietnam Time : From December, 2007 to February,2008 Checking Garment Factory

Project : Checking Garment Factory Customer : Hapro Group Location : Ninh Hiep IZ, Bac Ninh, Vietnam Time : From January, 2008 to February,2008 Training Course - ACS600

Project : Training Course - ACS600 Customer : Bai Bang Paper Company Location : Phu Ninh, Phu Tho Time : October, 2007 Chemical Scada System

Project : Chemical Scada System Customer : Chemical Factory - VINAPACO Location : Bai Bang, Phu Tho, Vietnam Time : From September to December, 2007 -
My Works in 2011
( 3 Danh mục )
My Work in 2011
- Previous
- Next
- Stop
- Play
Translate Documents - Hydro Power Plant

Project : Translate Documents - Hydro Power Plant Customer : Andritz Hydro GmbH - Representative at Hanoi Location : Hanoi, Vietnam Time : From May and August, 2011 Beer Factory Control System

Project : Beer Factory Control System Customer : Hanoi - Kim Bai Beer Factory Location : Kim Bai, Hanoi Time : From February to April, 2011 My Work in 2010
- Previous
- Next
- Stop
- Play
Beer Factory Control System

Project : Beer Factory Control System Customer : Hanoi - Kim Bai Beer Factory Location : Kim Bai, Hanoi Time : From October to December, 2010 Maintainance - Duong Malt Factory
Project : Maintainance - Duong Malt Factory Customer : Duong Malt Factory Location : Tien Son IZ, Bac Ninh, Vietnam Time : From August to December, 2010 Terminal Board for Schneider PLC

Project : Terminal Board for Schneider PLC Customer : Individual Customer Location : Hanoi, Vietnam Time : November , 2010 Stone Cutting Control Board Ver 2
Project : Stone Cutting Control Board Customer : Truong Xuan Company Location : Bac Giang, Vietnam Time : From July to September, 2010 Assembly Textile Machine Line
Project : Assembly Textile Machine Line Customer : Co Bi Garment Factory Location : Gia Lam, Hanoi, Vietnam Time : From June, 2010 Translate Documents - Hydro Power Plant

Project : Translate Documents - Hydro Power Plant Customer : Andritz Hydro GmbH - Representative at Hanoi Location : Hanoi, Vietnam Time : From April to December, 2010 Electrostatic Precipitator System

Project : Electrostatic Precipitator System Customer : VINAPACO Location : Bai Bang, Phu Tho, Vietnam Time : From May to July, 2010 Winder Machine Upgrade

Project : Winder Machine Upgrade Customer : Bai Bang Paper Company Location : Bai Bang, Phu Tho, Vietnam Time : From January to May, 2010 My Work in 2009
- Previous
- Next
- Stop
- Play
Translate Documents - Hydro Power Plant

Project : Translate Documents - Hydro Power Plant Customer : Andritz Hydro GmbH - Representative at Hanoi Location : Hanoi, Vietnam Time : From March to November, 2010 Stone Cutting Control Board Ver 1

Project : Stone Cutting Control Board Ver 1 Customer : Truong Xuan Company Location : Bac Giang, Vietnam Time : From July to September, 2010 PCB Design (VGA interface, Coupling Board)

Project : PCB Design (VGA interface, Coupling Board) Customer : BAPACO and Individual Customer Location : Bac Ninh and Phu Tho, Vietnam Time : December, 2010 Yen So Pumping Station Scada System

Project : Yen So Pumping Station Scada System Customer : Hanoi Sewerage and Drainwage Co.,Ltd Location : Yen So, Thanh Tri, Hanoi, Vietnam Time : From January to March, 2009 Automatic Voltage Regulator for Genrator

Project : Automatic Voltage Regulator for Geneator Customer : Thanh Nam Beer Factory Location : Le Mon IZ, Thanh Hoa, Vietnam Time : From March to May, 2009 Scada HMI Troubleshoot for Hai Ha JSC

Project : Scada HMI Troubleshoot Customer : Hai Ha Confectionery JSC Location : Viet Tri, Phu Tho, Vietnam Time : April, 2009 Training Course - Operation for DCS Centum CS3000

Project : Training Course - Operation for DCS Centum CS3000 Customer : Bai Bang Paper Company Location : Bai Bang, Phu Tho, Vietnam Time : January, 2009 Training - Operation,Engineering, Maintainace CS3000

Project : Training - Operation, Engineering, Maintainace CS3000 Customer : Lam Thao Chemical Factory Location : Lam Thao, Phu Tho, Vietnam Time : From May to June, 2009 Balance Control System for LASH Ship

Project : Balance Control System for LASH Ship Customer : VINASHIN Location : Hanoi - Sai Gon, Vietnam Time : From July,2009 to March, 2010 Profibus Network Troubleshoot for Duong Malt JSC
Project : Profibus Network Troubleshoot for Duong Malt JSC Customer : Duong Malt JSC Location : Tien Son IZ, Bac Ninh, Vietnam Time : December, 2009 Troubleshoot for Fiber Optical Devision

Project : Troubleshoot for Fiber Optical Devision Customer : Thang Long Cable JSC Location : Pho Noi A IZ, Hung Yen, Vietnam Time : December, 2009 My Work in 2008
- Previous
- Next
- Stop
- Play
Yen So Pumping Station Scada System

Project : Yen So Pumping Station Scada System Customer : Hanoi Sewerage and Drainwage Co.,Ltd Location : Yen So, Thanh Tri, Hanoi, Vietnam Time : From May to November, 2008 Translate Documents - DCS Supcon

Project : Translate Documents - DCS Supcon Customer : ZHEJIANG SUPCON Technology Co.,Ltd Location : Hanoi, Vietnam Time : August, 2008 Phu Gia Feed Mill Control System

Project : Phu Gia Feed Mill Control System Customer : Phu Gia Feed Mill (NASACO) Location : Kinh Mon IZ, Thanh Hoa, Vietnam Time : From May to November, 2008 Design Active Filter Experiment Panel

Project : Design Active Filter Experiment Panel Customer : Thai Nguyen University Location : Hitech Center, Hanoi, Vietnam Time : From March to May, 2008 Translate Documents - Operator Manual Gas Analysers

Project : Translate Documents - Operator Manual Gas Analysers Customer : Hoang Mai Cement Factory Location : Hanoi, Vietnam Time : January,2008 Training Course - Engineering for DCS Centum CS3000

Project : Training Course - Engineering for DCS Centum CS3000 Customer : Bai Bang Paper Company Location : Bai Bang, Phu Tho, Vietnam Time : February, 2008 My Work in 2007
- Previous
- Next
- Stop
- Play
Translate Technical Documents

Project : Translate Technical Documents Customer : Uong Bi Thermal Power Plant Location : Hanoi Time : October,2007 Training Course - Process Control

Project : Training Course - Process Control Customer : Asian Institute of Technology Center in VN Location : Hanoi, Vietnam Time : November, 2007 Coal Distribution System

Project : Coal Distribution System Customer : Ninh Binh Thermal Power Plant Location : Ninh Binh, Vietnam Time : From December, 2007 to February,2008 Checking Garment Factory

Project : Checking Garment Factory Customer : Hapro Group Location : Ninh Hiep IZ, Bac Ninh, Vietnam Time : From January, 2008 to February,2008 Training Course - ACS600

Project : Training Course - ACS600 Customer : Bai Bang Paper Company Location : Phu Ninh, Phu Tho Time : October, 2007 Chemical Scada System

Project : Chemical Scada System Customer : Chemical Factory - VINAPACO Location : Bai Bang, Phu Tho, Vietnam Time : From September to December, 2007
Thông tin về Autofind
![]() |
|
| Tên thật | : Lê Toàn Thắng |
| Ngày sinh | : 03-01-1984 |
| Giới tính | : Nam |
| Sống tại | : Bình Dương, VN |
Thống kê truy cập
Thăm dò ý kiến !
Các khách hàng
>>
- Previous
- Next
- Stop
- Play
Trò chuyện cùng Autofind
| Autofind | Autofind | Thangletoan | |||
| Autofind | Autofind | 84. 9.8414.8413 | |||
| Autofind | Autofind | 8412.2228.8222 |
Thông tin liên hệ
| Địa chỉ | : Thủ Dầu Một, Bình Dương, VN |
| Hỗ trợ KD | : +8412.2228.8222 |
| Hỗ trợ KT | : +84 .9.8314.8413 |
| : thangletoan@gmail.com |